General Description
Equipped together with the zero leak bidirectional checking sole-noid valves, this power unit is developed to the operation of two independent circuits. Which are respectively for the major and subordinate platforms on the double scissors lift. Two cut-off valves are utilised for decreasing the machine manually in situation of power reduction. If far more independent circuits are expected to your application please get hold of us for availability.
Remark: 1. Please check with our sales engineer for your unique pump displacement, motor electrical power or tank capability.
2. CSA or UL certified motors are available upon request.
Particular Notes
1. The AC motor is of S3 duty cycle, which could only work intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean the many hydraulic parts concerned prior to installation of the energy unit.
3. Viscosity on the oil shoud be 15~46 cst,as well as oil really should be clean and cost-free of impurities,N46 hydraulic oil is recommended.
4. The energy unit should be mounted vertically.
5. Check the oil degree from the tank after the preliminary running of your energy unit.
six. Oil shifting is required just after the preliminary 100 operation hours,afterwards after every 3000 hours.
Electrical power UNITS FOR DOUBLE-SCISSORS LIFT
Tags: